Move everyone onto a fix
A bug in Archive 1.0 is fixed in commit b72d0f5. Releasing the fix is the easy part: this guide makes sure everyone using Archive 1.0 ends up on it. See Deprecations, blocks and floors for what a floor is.
1. Release the fix
Merge the fix and let your group's build release it, say as Archive 1.0 (b72d0f5). A floor's commit has to be a released one.
2. Require the fix
In plinto code, open that release and press Require b72d0f5…:
- Why does everyone need it? Builds print it with their warning, and when they stop.
- Builds stop below it from: 14 days on to start with, which lets two weekly merges carry the fix in. Tick Now for a hole that can't wait.
- Below it, from git: every release of
1.0without the fix, whatever its number. Untick one that has the fix another way, such as cherry-picked onto a release branch: it counts as having it.
Press Require b72d0f5. If Archive 1.0 is blocked, the form unblocks it in the same step: the fix goes through, and releases below stay stopped from the date.
3. Watch who has updated
Who has updated → on the floor's notice opens the floor's page:
- Groups below it: in the Groups app their pin is marked below the floor, and moving it onto the fix is an edit like any other, saved with a build. A group that holds its release there says so: update it, or release the hold and let the next merge bring the fix in. A group tracking one that has moved gets the fix with its weekly merge.
- Built with one below: releases the groups pin that were built with a release below. Their next build in the group moves them.
- Servers running a release below, or one built with one, keep running it until a release on the floor is deployed to them.
4. Workspaces
People's workspaces meet the floor at their next build. Until the date it warns, and says what to run:
Archive 1.0-8, which shop uses through Payments 2.0, is below acme's floor for Archive 1.0: archives drop symbolic links. Update to Archive 1.0-9 (b72d0f5) or later by 10 Nov 2026; builds stop from then. main pins Archive 1.0-9 at its latest revision 305, and this workspace is at 300: run `plinto update`
From the date the build stops, before downloading anything. When the group itself still pins a release below, the message says to update it in the Groups app first.
5. When a build has to go through
From the date, a build below the floor stops. If one must go through anyway, say during an outage, press Build override… on the stopped build and say why; on your machine, run plinto build --override "why". It covers that build only, and plinto keeps who and why. Deploying never needs one: a floor stops builds, not deployments.
6. A newer fix, or done
A newer release on the floor has Raise the floor to … to require its commit instead. Remove the floor ends it, once everyone has moved.